Deposits
This category includes the deposits which will be required for the development. Assuming that all of the deposits are refunded at the end of the construction phase.
• Gas |
• Electricity |
• Water/Sewer |
• Telephone |
The timing of this type of project is largely based on the amount of time it takes to:
• Obtain necessary permits |
• Obtain financing |
• Availability of subcontractors |
• Availability of city inspectors |
• Architect's response time |
• Availability of materials |
• Availability of the F. F. & E. |